Sorry! You can't edit your cart on this page.
Sorry! This item could not be added to your cart as it is no longer available from Comms Express.
Please check the quantity you are adding and try again.
The following item has been added to your cart.
Product Code:
Options:
Qty:
Unit Price:£
View Cart
Checkout
Your cart is empty.
Subtotal:
£0
Learn more about how
to collect Data Points
for free gifts.
Remove all items from cart
Are you sure? Yes No
Request A Quote
View Cart
Apply for a Credit Account
Checkout
Cookie Policy×

Hi there! Our website may store cookies on your computer in order to give you the best experience, such as remembering the items in your cart so you can continue shopping where you left off.

By continuing to use our site, you give consent for cookies to be used.

Browse Categories
CoolControl Integrated Seal 18cmx20cm (Cut Out 14x16)

CoolControl Seal Simply seal - reduce bypass by airflow up to 63%, saving energy and money! Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer avail¬able for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.
What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.
How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cut-outs with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders. Advantages of CoolControl seal at a glance: Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure
Technical Specifications - CoolControl Seal Material (fibre brushes) - Nylon-66, including internal flexible lip
Cut/Layout brushes - circular with multiple layers
Material (frame) - Aluminium, static dissipating
Mounting - with screws and/or double-sided self adhesive tape
Dimensions & cut outs - variable (s.ordering details) and customised on request

View More
In Stock: Next Day
£40.00
£48.00 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Integrated 18cm x 2

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£57.50
£69.00 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Integrated 27cm x 2

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£74.60
£89.52 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Half Integrated 9cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£74.60
£89.52 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Half Integrated 13.

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£81.45
£97.74 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Surface 18cm x 28cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£68.60
£82.32 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Surface 27cm x 28cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£90.00
£108.00 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Half Surface Extend

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£90.00
£108.00 Inc Vat.
Qty:
CoolControl Floor Entry Seal - Half Surface Extend

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£98.60
£118.32 Inc Vat.
Qty:
CoolControl Floor Entry Seal Safety Plate - Integrated 18cm x 28cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£12.00
£14.40 Inc Vat.
Qty:
CoolControl Floor Entry Seal Safety Plate - Integrated 27cm x 28cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£15.50
£18.60 Inc Vat.
Qty:
CoolControl Floor Entry Seal Safety Plate - Half Integrated 9cm x 60cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£17.15
£20.58 Inc Vat.
Qty:
CoolControl Floor Entry Seal Safety Plate - Half Integrated 13.5cm x 60cm

Why should the sealing cable openings be a fixed part of your routine?
According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

What can you do?
Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

How to install a CoolControl Seal?
The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

Advantages of CoolControl Seal at a glance:

Up to 63% higher data centre energy efficiency
Reliable raised floor opening seal eliminating bypass airflow
Prevents system failures and downtime caused by overheating and hot spots
Significant increases under floor static air pressure

View More
In Stock: Next Day
£19.75
£23.70 Inc Vat.
Qty:
Other Ranges Available
AirGuard Grommets
AirGuard Grommets
View Range
KoldLok Grommets
KoldLok Grommets
View Range
Join Our Mailing List
Join Now
View this week's eShot
Social Links
  • Apply for Credit