Product Code: | |
Options: | |
Qty: | |
Unit Price: | £ |
If you wish to enquire about this product please contact us on
0800 488 0000
ServerLIFT SL-500X - Automatic server lifter for heavy IT components in the data centre
In the past, rack mounting and moving heavy and bulky IT components around the Data Centre was difficult. This back breaking work was performed by the Data Centre technical or facility personnel with only some relief provided by using a trolley or cart to move the equipment to the cabinets. At least two people were needed to lift the heavy IT equipment up to the desired RU space in the cabinet. This procedure presents a high risk of injury for the Data Centre staff as well as a potential danger of damaging sensitive and valuable IT equipment. These difficulties are compounded by the fact that today’s Data Centres are growing dynamically and therefore IT hardware has to be changed, supplemented, relocated and reconfigured ever more frequently. Trolley carts and the muscle power of the IT staff naturally reach their physical limits, so the only way to correspond to the increasing demands is to use a capable transportation and server lifting solution.
Increase Safety with the SL-500X ServerLIFT
The heavy duty ServerLIFT SL500X is ready for use within minutes. It is capable of moving 227 kilograms of IT equipment to any location within the Data Centre. There, the load can be lifted automatically to a maximum height of 2.4 metres. The whole lifting procedure takes only 30 seconds. A single operator is able to navigate the heavy load easily through doorways, narrow Data Centre aisles and can rotate on it on its axis to any degree and into the smallest of spaces.
For added convenience, the ServerLIFT SL500X is equipped with a built-in battery charger and charge indicator. Both guarantee that the lifting solution is provided with the optimal power for its heaviest work at any time. To make sure that this can be done with the required safety and stableness, the wheels of the ServerLIFTer chassis are secured for each lifting process with the integrated stabiliser brake system.
ServerLIFT SL500X Highlights:
Touch-Stop Sensor©
Heavy Duty Platform
Fits through standard size doorways
Includes strap kit to secure IT Hardware
Built-In Easy Glide Shelf
Adds 6? lateral movement to the left and right
Lift and slide into standard 19? racks
Seamless install from platform into rails
Fully Powered Lifting
Precise height adjustment
Proprietary micro-processor controlled lifting system
Dual side controls allow a single operator to align equipment
Base Specifications
US | Metric | |
Height (Lowered) | 5? 10? | 1.76 m |
Height (Raised) | 9? 4? | 2.85 m |
Length | 3? 8? | 1.12 m |
Width | 2? 5? | 0.625 m |
Platform Height-Extended | 8? | 2.44 m |
Platform Height-Stowed | 5.3? | 13.5 cm |
Load Capacity-Platform Centre | 500 lbs | 226.8 kg |
Load Capacity-Edge | 300 lbs | 136.08 kg |
Platform Movement / side | 6? | 15.24 cm |
Movable Platform-Width | 14 3/4? | 37.6 cm |
Platform Length | 24? | 61 cm |
Total Platform Width | 21? | 53 cm |
Rear Caster Diameter | 5? | 12.7 cm |
Front Caster Diameter | 3? | 10.2 cm |
Caster Width | 2? | 5.08 cm |
Total Unit Weight | 428 lbs | 194 kg |
In the past, rack mounting and moving heavy and bulky IT components around the Data Centre was difficult. This back-breaking work was performed by the Data Centre technical or facility personnel with only some relief provided by using a trolley or cart to move the equipment to the cabinets. At least two people were needed to lift the heavy IT equipment up to the desired RU space in the cabinet. This procedure presents a high risk of injury for the Data Centre staff as well as a potential danger of damaging sensitive and valuable IT equipment. These difficulties are compounded by the fact that today’s Data Centres are growing dynamically and therefore IT hardware has to be changed, supplemented, relocated and reconfigured ever more frequently. Trolley carts and the muscle power of the IT staff naturally reach their physical limits, so the only way to correspond to the increasing demands is to use a capable transportation and server lifting solution.
The heavy-duty ServerLIFT SL500X is ready for use within minutes. It is capable of moving 227 kilograms of IT equipment to any location within the Data Centre. There, the load can be lifted automatically to a maximum height of 2.4 metres. The whole lifting procedure takes only 30 seconds. A single operator is able to navigate the heavy load easily through doorways, narrow Data Centre aisles and can rotate on it on its axis to any degree and into the smallest of spaces.
For added convenience, the ServerLIFT SL500X is equipped with a built-in battery charger and charge indicator. Both guarantee that the lifting solution is provided with the optimal power for its heaviest work at any time. To make sure that this can be done with the required safety and stableness, the wheels of the ServerLIFTer chassis are secured for each lifting process with the integrated stabiliser brake system.