Easter Bank Holiday Weekend
Early Closing Thursday

We will be closing early on Thursday 28th March at 16:30

Last orders: 16:00 (next day: 15:30) | CLOSED - Good Friday & Easter Monday

Call us FREE on 0800 488 000
X
X

Please Log In Below

Forgotten Password?
Retry
Login
loading Gif
Sorry! You can't edit your cart on this page.
Sorry! This item could not be added to your cart as it is no longer available from Comms Express.
Please check the quantity you are adding and try again.
The following item has been added to your cart.
Product Code:
Options:
Qty:
Unit Price:£
View Cart
Checkout
Your cart is empty.
Subtotal:
£0
Remove all items from cart
Are you sure? Yes No
Learn more about how
to collect Data Points
for free gifts.
Comms Express Finance Options
Request A Quote
View Cart
Checkout
Cookie Policy×

Hi there! Our website may store cookies on your computer in order to give you the best experience, such as remembering the items in your cart so you can continue shopping where you left off.

By continuing to use our site, you give consent for cookies to be used.

Spend £100.00 for
FREE DELIVERY.
Free delivery excludes heavy and bulky products
Browse Categories
End of Life Product
£12.00
£14.40 Inc VAT
Earn 6 Data Points when purchasing this product. More Info
Sorry, this item is no longer available from Comms Express.

CoolControl Floor Entry Seal Safety Plate - 18cm x 28cm Integrated

by Upsite Technologies
See more product details
Part No:DCCC1828ISP
Manufacturer No:4112-1828
Delivery: End of Life Product
More Related Items
Click to change options
Colour:
Apply
£140.00 Ex VAT
Qty:
Click to change options
Length:
Fibre Size:
Apply
£4.77 Ex VAT
Qty:
Click to change options
No. Sockets:
Input Type:
Surge Protect:
Apply
£24.00 Ex VAT
Qty:
Email product to a friend
X
  • Scroll to top
    CoolControl Floor Entry Seal Safety Plate - 18cm x 28cm Integrated

    Why should the sealing cable openings be a fixed part of your routine?
    According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

    What can you do?
    Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

    How to install a CoolControl Seal?
    The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

    Advantages of CoolControl Seal at a glance:

    • Up to 63% higher data centre energy efficiency
    • Reliable raised floor opening seal eliminating bypass airflow
    • Prevents system failures and downtime caused by overheating and hot spots
    • Significant increases under floor static air pressure

    Why should the sealing cable openings be a fixed part of your routine?
    According to Gartner, a staggering 40% of the total energy costs of any given data centre are incurred through cooling - increasing at an accelerating rate! There is no need to invest in costly cooling technology to reverse this trend. Small and simple thermal improvements create significant functional and cost savings - all with low investment costs and amortisation periods of between three and six months. A huge ‘side effect’ is that servers and network equipment runs cooler and have fewer heat related failures. According to Gartner’s 11 Best Practices to save energy in the data centre, sealing raised floor cable openings is the number one on the list. The Uptime Institute states that up to 63% of expensive cooled air is lost through unsealed cable openings; this conditioned air is therefore no longer available for cooling vital locations and cabinets where servers are located - a disaster with regards to energy consumption and your balance sheet.

    What can you do?
    Quite simply, you install cost-effective CoolControl Seals. These consist of a solid aluminium frame containing nylon fibre brushes and a specially integrated internal barrier that seamlessly wraps around cables and other equipment that is inserted through the openings in the data centre raised floor. The openings are sealed meaning that no valuable cooled air can escape. Through this cleaver, but simple method you can increase the efficiency of your data centre cooling, improve the effectiveness of your cooling systems and realize significant energy savings.

    How to install a CoolControl Seal?
    The system is installed within seconds either sealing existing cable cutouts with a surface mounted unit or integrated into the floor for new cut outs. For existing installations, simply open the aluminium profile, slide the cables to the centre of the CoolControl Seal and close the profile. Quick, easy and painless! For new cable openings, just slide the complete CoolControl Seal frame in the cut out opening and pull the cables through. Fixing the aluminium frame, which ensure static dissipation, can either be done with screws or adhesive tape. With our unique design, there is no limitation in size or length of the cable cut-outs. Contact us directly if you require longer or custom lengths - there are no long lead times or large minimum orders.

    Advantages of CoolControl Seal at a glance:

    • Up to 63% higher data centre energy efficiency
    • Reliable raised floor opening seal eliminating bypass airflow
    • Prevents system failures and downtime caused by overheating and hot spots
    • Significant increases under floor static air pressure
    Email product to a friend
    Print product details
    View Keywording:
    Customers also Purchased
    £739.00 Ex VAT
    £739.00 Ex VAT
    £739.00 Ex VAT
    £739.00 Ex VAT